[easymedia-gallery med=”912″]Located in Tiburon, California and completed in 1997, this two story 3800 Sq. Ft. project was constructed on a down sloped lot and required both cut and fill and the use of concrete retaining walls.
The building structure was comprised of wood framing, several steel moment frames, and prefabricated roof trusses supporting an asphalt shingle tiled roof.